Configuring an Upgrade Schedule

After you have the image file on ExtremeCloud IQ Controller, you can upgrade right away or schedule an upgrade.

To schedule an upgrade:

  1. Go to Admin > System > Software Upgrade.
  2. In the Upgrade section, from the Upgrade field, select Schedule and select Configure Schedule.
    The Schedule Upgrade dialog displays.
  3. Configure the following parameters:
    Upgrade Image
    Name of the upgrade image file.
    Backup Filename
    Name of the backup image file.
    Backup Location
    Indicates where to save the backup image file. Local is currently the only supported value. Save the backup image locally on ExtremeCloud IQ Controller.
    Time
    The time of the scheduled upgrade in 24-hour format, HH-MM.
    Date
    The date of the scheduled upgrade in Month-Day format (MM-DD).
    Note

    Note

    When you supply a Date and Time that is in the past, the schedule is set for the following year at the specified date and time.
  4. Select Schedule.